Product Comparison

Aesthetics Strength Anteriors Posteriors Turnaround Time (in lab) Origin Process Occlusal Clearance
48 Hour Crowns Refer to chosen material Refer to chosen material 2 in lab days - Refer to chosen material Refer to chosen material Learn more
Titanium Crowns 8 in lab days (Also available in the 48 Hour Range) CAD/CAM designed and manufactured 1.0mm Learn more
Gold Crowns 7 in-lab days for non-precious metal
10 in-lab days for precious metal
CAD/CAM designed, resin printed and traditionally cast 1.0mm Learn more
Premium Splint (Digitally Made)

-

- - 4 in-lab days CAD/CAM process to your Conventional or Digital model - Learn more
Night Splint (Soft)

-

- - 4 in-lab days Thermoformed to your stone model or resin printed from a digital scan - Learn more
Occlusal Splint (Hard/Soft)

-

- - 4 in-lab days Thermoformed to your stone model or resin printed from a digital scan - Learn more
Anterior Jig (Clenching Inhibitor)

-

-

- - 4 in-lab days Thermoformed to your stone model or resin printed from a digital scan, with thermoplastic internal lining fitted - Learn more
UTZirc 100% 7 in lab days (Also available in the 48 Hour Range) CAD/CAM designed and manufactured 1.0mm-2.0 mm Learn more
Model-free restorations Refer to chosen material Refer to chosen material 4 in lab days Refer to chosen material Refer to chosen material Learn more
Hybrid PMMA Implant Restoration 10 to 14 in-lab days Designed and milled using CAD / CAM N/A Learn more
Mouthguards

-

Varies from 1-5 - - 3 in-lab days Thermoformed to your stone model or resin printed from a digital scan - Learn more
100% Monolithic Zirconia Crown 7 in-lab days (Also available in the 48 hour range) Designed and milled using CAD / CAM 1.0mm functional, 1.5mm nonfunctional Learn more
Laminated Zirconia 8 in-lab days Designed and milled using CAD/CAM, veneered with porcelain 2.0mm Learn more
IPS e.max® 7 in lab days (Also available in the 48 Hour Range) CAD/CAM designed and manufactured 2.0mm incisal Learn more
PMMA Temporary Crowns 5 in-lab days CAD/CAM designed and manufactured 1.5mm Learn more
VITA Suprinity® 7 in-lab days (Also available in the 48 Hour Range) CAD/CAM designed and manufactured 1.0mm - 1.5mm Learn more
VITA Enamic® 7 in-lab days (Also available in the 48 Hour Range) CAD/CAM designed and manufactured 1.0mm - 1.5mm Learn more
Porcelain Fused to Metal (PFM) 8 days for non-precious metal
10 days for precious metal
Designed and milled using CAD/CAM, veneered with porcelain 2mm functional, 2.5mm non-functional Learn more
Post and Core Metal Post (single) 6 in lab days, Post with Crown 8-10 in lab days Traditional build up and cast In line with selected crown material Learn more
Nylon Splint - - 12 in-lab days - Learn more